← The Eastside Wire
Infrastructure

I-405, SR 161, and US 2 closures for construction

πŸ”Š Listen Β· narrated by Aiden

WSDOT has implemented multiple road closures and lane reductions effective this week for construction and maintenance.

I-405 will have nightly closures of two express toll lanes northbound between mileposts 17.45 and 18.12 from August 10-14, and southbound lane closures between mileposts 5 and 3.2 on August 13-14. SR 161 will be reduced to one lane between milepost 2.5 and Center Street East in Eatonville on August 15. US 2 will have alternating traffic with flaggers nightly from August 10-27 between mileposts 41 and 42.

The closures are for road repairs, bridge work, and utility projects. Travelers should expect delays and plan accordingly. The affected routes are key corridors for commuters and regional traffic.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts5 of 8 claims supported Β· 63%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    WSDOT has implemented multiple road closures and lane reductions effective this week for construction and maintenanceβ€œ405: Monday, August 10 to the morning of Friday, August 14: Two Express Toll Lanes (ETL’s) of northbound I-405 between milepost 17.45 and milepost 18.12 will be closed, nightly from 8:30 p.m. - 5 a.m.”
  • βœ“
    I-405 will have nightly closures of two express toll lanes northbound between mileposts 17.45 and 18.12 from August 10-14β€œ405: Monday, August 10 to the morning of Friday, August 14: Two Express Toll Lanes (ETL’s) of northbound I-405 between milepost 17.45 and milepost 18.12 will be closed, nightly from 8:30 p.m. - 5 a.m.”
  • βœ“
    I-405 will have southbound lane closures between mileposts 5 and 3.2 on August 13-14β€œ405: Up to three lanes of southbound I-405 from milepost 5 to Talbot Road South (milepost 3.2) will be closed overnight, 10:30 p.m. Thursday, Aug. 13 to 5:15 a.m. Friday, Aug. 14.”
  • βœ“
    SR 161 will be reduced to one lane between milepost 2.5 and Center Street East in Eatonville on August 15β€œ161: From 6 a.m. to 3:30 p.m. Saturday, Aug. 15, sections of SR 161 will be reduced to one lane between milepost 2.5 near the Mashel River Bridge and Center Street East in Eatonville for road repairs. Travelers can expect stops for up to 15 minutes while flaggers alternate one-way traffic during the work.”
  • βœ“
    US 2 will have alternating traffic with flaggers nightly from August 10-27 between mileposts 41 and 42β€œNightly from 9 p.m. to 5 a.m. the next day (except Friday, Saturday and Sunday) beginning Monday, Aug. 10 to 5 a.m. Thursday, Aug. 27, US 2 traffic will alternate with flaggers from Northeast 194th Place (milepost 41) to east of Northeast 182nd Street (milepost 42) for utilities work.”
  • ⚠
    The closures are for road repairs, bridge work, and utility projectsNo usable supporting receipt β€” unverified.
  • ⚠
    Travelers should expect delays and plan accordinglyNo usable supporting receipt β€” unverified.
  • ⚠
    The affected routes are key corridors for commuters and regional trafficNo usable supporting receipt β€” unverified.

The Eastside Wire is free. Get Puyallup's news delivered every morning.